
Before the first day on site, the works need to be signposted with the right details. We design, print and install the sign so this piece of paperwork doesn't slow you down.
The construction site sign is one of those details that often gets left until the last minute, when in reality it's usually required from day one of the works. At Original Graphics we handle it start to finish: we gather the permit and project details, design the artwork, print it on materials built to withstand months outdoors, and install it on site.
A complete service so you don't have to coordinate design, printing and installation separately.
You send us the permit and project details (developer, contractor, technical staff, permit number and date, planned duration of the works) and we confirm the recommended size for your council. Once the artwork is approved, we print it and mount it on the matching support structure, then install it on site on the day you tell us.
We work with Dibond and PVC forex panels, UV-protected laminated vinyl to stop the print from fading, and galvanised or treated timber support structures, depending on the installation point and the planned duration of the works.
For developers, construction companies, architecture studios and private clients about to start a project who need the legally required sign sorted without hassle, as well as public bodies tendering public works that need the project signposted.
Our workshop is in Caldes de Malavella, right by the AP-7 motorway, which lets us give a fast turnaround across the whole province of Girona — Girona city, Figueres, Blanes, Lloret de Mar, Salt, Palafrugell, Olot and the Costa Brava — and the rest of Catalonia, from La Jonquera down to Barcelona.
What information must a construction site sign legally show?
This varies a little by municipality, but it usually needs to show the building permit number and date, the developer and contractor details, the responsible technical staff (architect, surveyor or engineer), and the planned start and end dates of the works. We help you confirm exactly what your local council requires before we design it.
How quickly can a construction site sign be ready?
We produce it on an urgent basis, typically within 24-48 hours of confirming the details, since it usually needs to be in place before work starts.
What size does a construction site sign need to be?
It depends on local regulations and the scale of the project; some municipalities set minimum sizes. We recommend the right size for your council and project type, and can also produce it to a specific custom size if needed.
Do you install the sign on the construction site itself?
Yes, we bring the sign mounted on its support structure (posts or an A-frame) and install it directly on the plot or on the site hoarding, ready to be visible from the street.
We produce construction site signs across Girona province.
Work starts.
The sign goes up first.